Home›Use cases›Construction and Building Materials Demand Intelligence
Sales teams

Spot construction project leads before the permit is filed

A permit database is accurate and it starts at the filing. A site is cleared, staked and excavated weeks earlier, in plain view. Sena reads the sites, so the pipeline reaches you while the specification is still open.

Backed by NVIDIA Inception, Techstars, and Plug and Play. Every site in the pipeline is a real location that was visited and recorded, with the coordinates, the date and the photograph attached. A multi-step QA flow checks each signal before it becomes a decision.
The problem

Your lead source starts at the filing. The specification was decided before it.

What Sena decides

Which sites in your markets are under way, what stage each has reached, how large it is, and which of them are early enough to influence.

Industries

Building MaterialsConstruction EquipmentArchitecture and EngineeringCommercial Development

Who it is for

Sales and commercial, market intelligence, supply chain, and strategy teams at materials manufacturers, equipment suppliers, and specialist contractors.

Powered by

Sena, the Decision AI from Rwazi.

Decision AI with access to real-world data

The problem

Commercial construction project leads reach the market through the paperwork, and the paperwork is late by design.

The permit database is accurate and downstream

It records what was filed, when it was filed, and by whom. Every entry is correct. The filing happens after the drawings are done, and by then the specification names a product.

The site announces itself first

Clearing, staking, a setting-out crew, an excavator, a laydown yard. Each is visible from the road and each is a fact about the project weeks or months before anything reaches a register. Anyone can see them and almost nobody is looking systematically.

So the race is decided before the pipeline updates

The manufacturer who takes the lead on construction projects in a market is the one who reached the developer while the choice was still open. That is a question of when the information arrived, where the accuracy was already sound.

The question is narrow. Which sites in your markets are moving now, and how much notice does each one give you.

WHAT THE REGISTER HOLDS 10 FILINGS. ACCURATE, AND LATE. WHAT THE STREET SHOWS 14 ACTIVE. +6 SITES NOT YET FILED

Illustrative figures.

STAKING CLEARING STAKING EXCAVATION CLEARING STAGING ONE METRO REGISTER · 10 ACTIVE · 14 NOT FILED · 6 THE DIFFERENCEIS THE PIPELINE ILLUSTRATIVE FIGURES. ONE SWEEP OF ONE METRO.
ONE METRO, ONE SWEEP REGISTER · 10 ACTIVE · 14 NOT FILED · 6 2 STAKING, 2 CLEARING, 1 EXCAVATION, 1 STAGING THE DIFFERENCE IS THE PIPELINE

Illustrative figures. One sweep of one metro.

How it works

How Sena builds construction project leads from site evidence

01
MONTHLY A SWEEP, NOT A FILING

Set the markets and the sweep

Name the metros or corridors that matter and the cadence. The read is a systematic sweep of the built area, where a filing triggers a response.

02
SITE 0417 12 SEP STAKES EVERY ACTIVE SITE

Record every site showing activity

Sena Computer Vision visits and records what is visible: clearing, staking, setting out, excavation, equipment staged, structure rising. Each record carries coordinates, a date and a photograph.

03
EXCAVATION 2,400 m² · 6 storeys STAGE SETS THE NOTICE

Classify the stage and the scale

Sena reads the record and returns the construction stage each site has reached and its observed scale: footprint, storeys where visible, and site type. Stage tells you how much notice you have.

04
SITE STAGE + SCALE YOUR RANGE + SPEC YOUR DEMAND

Read it against your own product and specification data

The observed stage and scale come to you as facts. Your team converts them into product demand, since the tonnes and the categories depend on your range and your specification history.

05
AUGSEPOCT STAGE 2STAGE 3STAGE 4 +2 NEW SITE MOVES UP A STAGE

Sweep again, on a cycle

Monthly or on the cadence you commission, so a site that was cleared last month and excavated this month shows as progressing, and new sites enter the pipeline as they appear.

Illustrative drawings and figures.

Industries served

Industries and Rwazi capabilities involved

IndustryWhy it applies
Building MaterialsCore. Specification happens early and a manufacturer outside the conversation at that point is quoting against a named product.
Construction EquipmentRental and sales decisions are taken at the start of a project, so the earliest stages are the commercial window.
Architecture and EngineeringProject leads construction firms chase for design and engineering work are decided earliest of all, often before any site work at scale.
Commercial DevelopmentMarket-level activity is a read on where capital is going, ahead of any published index.

Check out Rwazi and Sena capabilities

CapabilityWhat it does here
Sena Computer VisionCore. Sweeps the markets and records every site showing activity: stage, observed scale, coordinates, date, photograph.
Sena (Decision AI)Core. Classifies stage and scale, tracks progression between sweeps, and holds the pipeline against the filings you already receive.

Property only on this page. Every input is a fact about a site.

The gap

How much notice each stage gives you

Visible evidence arrives in sequence, and the earlier the stage you can act on, the longer the runway. Leads for construction projects are worth what their timing is worth.

StageWhat is visibleRoughly how much notice
Staking and setting outA setting-out crew, stakes, marking paint, a site notice.The longest. Design is often live and specification is wide open.
NOTICE PERMIT FILED ~ HERE STAGE 1 OF 5
Clearing and demolitionVegetation stripped, an existing structure coming down, hoarding up.Long. The project is committed and the material choices are usually still in play.
NOTICE PERMIT FILED ~ HERE STAGE 2 OF 5
ExcavationEarthmoving, spoil heaps, shoring, a formed pad.Moderate. Substructure is decided, superstructure often remains open.
NOTICE PERMIT FILED ~ HERE STAGE 3 OF 5
Equipment stagingA laydown yard, a crane base, site cabins, a delivery gate.Shorter. Main packages are being let.
NOTICE PERMIT FILED ~ HERE STAGE 4 OF 5
Structure risingFrame, floors, envelope going on.Shortest. Fit-out and finishes packages remain open.
NOTICE PERMIT FILED ~ HERE STAGE 5 OF 5

A permit register enters this sequence somewhere in the middle, which is why two manufacturers reading the same market can be months apart on the same project. Reading the earliest two stages is what separates a pipeline from a bid list.

Ask Sena

Illustrative interface. Numbers are an example, not a Rwazi result.

Who uses it

Roles and functions

Sales and commercial

Works a pipeline of sites at the earliest stage, so the conversation happens while specification is open.

Market intelligence

Reads activity levels across markets as an early indicator, ahead of published construction indices.

Supply chain

Sees the volume of activity building in each market, which informs capacity and logistics planning on the manufacturer's own conversion.

Strategy

Watches where activity is shifting geographically, which is a signal about where to add distribution or capacity.

Specification and technical

Reaches the design team while material choices remain open, which is the only point specification can be influenced.

Why teams trust Sena

Why teams choose Sena for this

What you needWhat Sena does
Notice, alongside accuracyRecords sites at the stage they become visible, where a filing register begins at the paperwork.
The stage, beyond the locationClassifies how far along each site is, since construction projects leads are worth what their timing is worth.
Evidence attachedEvery site carries coordinates, a date and a photograph, so a sales team can qualify before it travels.
A repeating sweepRuns monthly or on your cadence, so progression and new starts both surface.
20-min live walkthrough

Talk to Sena about the sites moving in your markets this month

Tell us the decision you are weighing, and we will bring the market read to the conversation.

Watch a live demo of Sena Decision AI
See this use case run on a market like yours
Get the questions from your own team answered

Start from your own question

Bring the decision in front of you and we will run the first read against it on the call.

Talk to the Rwazi team

FAQs

01 What are construction project leads?
Information about a construction project early enough to act on: where it is, what it is, how large, what stage it has reached, and who is behind it. Most sources build this from permit filings, tender notices and planning applications, which are accurate and begin at the paperwork. The alternative is to read the sites themselves, since clearing, staking and excavation are visible weeks or months before a filing appears.
02 How do you find commercial construction project leads early?
Sweep the market, where watching the register waits on paperwork. A systematic pass over the built area records every site showing activity and what stage it has reached, which surfaces projects that have yet to reach any database. Leads for commercial construction projects generated this way arrive at the stage where specification is still open, which is the window a materials or equipment supplier needs.
03 Are residential construction project leads different from commercial?
Yes, in cycle length and in who decides. Residential projects move faster from clearing to structure, the specification is often set by a builder, where commercial work runs through an architect, and volume matters more than any single site. Commercial runs longer, involves more parties, and rewards being early by a wider margin. The visible stages are the same in both, and how much notice each stage buys you differs.
04 How do you find construction project leads ahead of the permit?
Read the evidence on the site. Stakes and marking paint, cleared vegetation, hoarding, an excavator, spoil heaps, site cabins and a crane base each mark a stage of progress and each is visible from a public road. Recording them systematically across a market is how teams generate commercial construction project leads ahead of the register, because the register begins at the filing and the site begins before it.
05 What does "construction project leads open" mean?
Usually a project open for bid or tender, so a contractor or supplier can still submit. It is a useful filter and a late one: by the time a package is open for bid, the specification behind it is typically written. Reading sites at earlier stages catches the same project while the specification is being decided, where a bid answers one already written.
06 What do construction project lead services usually provide?
Most supply a feed built from public records: permits, tenders, planning applications and license filings, with contact details attached. That is genuinely useful and it shares one property across every provider, which is that the record begins when a document is lodged. A site read complements it by covering the period before the document exists, which is why the two sit together and cover different periods.
07 Does this work for specialist trades like fire protection?
It does, and the useful stage differs by trade. Construction project lead generation fire protection teams need is tied to when systems are specified and let, which is later than substructure and earlier than fit-out. Roofing, glazing, mechanical and electrical each have their own window. Since the read records the stage each site has reached, a trade can filter the pipeline to the stage that matters to it.
08 Is there an app for checking new construction project leads?
The delivery format matters less than what feeds it. Any interface, mobile included, is only as early as its source, so a feed built on filings arrives at the same time however it is displayed. Rwazi supplies the site records with coordinates, dates and photographs attached, and those flow into the systems your sales team already uses.
09 What to know about construction project leads before buying a source?
Four things. When the source begins, since that sets your lead time and everything else follows from it. What it covers geographically, and how completely inside that footprint. What each record contains, and whether a salesperson can qualify from it before a site trip. And how often it refreshes, because a pipeline that updates monthly and a market that moves weekly are a poor match.
10 Can you get free construction project leads?
Some public sources cost nothing: municipal permit portals, published tender notices and planning registers are open in most jurisdictions. They carry the same timing property as the paid versions built on top of them, so free changes the price and leaves the lead time where it was. The cost that matters is usually the time spent assembling them and the projects that were decided before any of them published.